The entrance to the job is right through there. It is a tight
fit.
|
First we drive a short steel piling into the ground as far as we
can.
|
That's down to the water almost. Now we weld the main part on top
of this one.
|
Grind the piling out and weld a sleeve inside to guide the main
pile on with.
|
That's 40 ft long and 10 inch Steel pipe. Cleats and fittings
have been welded on already.
|
Now we carefully pick the main up and move over to place it on
the other.
|
Quite a crowd has gathered to watch of course.
|
Up close and personal with steel pipe.
|
It sure looks straight to me. What do you think?
|
Look waaaay up.
|
Lots bigger than us.
|
Call Us. 250-701-3981
|
|
|