The entrance to the job is right through there. It is a tight
fit.
|

First we drive a short steel piling into the ground as far as we
can.
|

That's down to the water almost. Now we weld the main part on top
of this one.
|

Grind the piling out and weld a sleeve inside to guide the main
pile on with.
|

That's 40 ft long and 10 inch Steel pipe. Cleats and fittings
have been welded on already.
|

Now we carefully pick the main up and move over to place it on
the other.
|

Quite a crowd has gathered to watch of course.
|

Up close and personal with steel pipe.
|

It sure looks straight to me. What do you think?
|

Look waaaay up.
|

Lots bigger than us.
|